general principles

Transkrypt

general principles
GENERAL PRINCIPLES
of placing advertisements in publications of Agora S.A.
APPENDIX No. A1
DEADLINES FOR PLACING ORDERS, DELIVERY OF CONTENT / PRINT-READY MATERIAL / CHANGES TO THE ADVERTISEMENT
CONTENT AND CANCELLATION OF ORDER FOR „GAZETA WYBORCZA”
Table No. 1
EDITION
DEADLINES FOR PLACING ORDERS, DELIVERY OF PRINT-READY MATERIAL / AMENDMENTS TO THE ADVERTISEMENT CONTENT AND CANCELLATION OF ORDER
Deadline for placing orders
Deadline for delivery and amendment
Deadline for cancellation od order
of print-ready material2
Gazeta Wyborcza1
2 working days before publication
(nation-wide, Warsaw & local pages)
1 workin g day before publication by 10 a.m.
(nation-wide, Warsaw & local pages)
MONDAY
Thursday in the week before publication (nation-wide pages)
Friday in the week before publication (Warsaw & local pages)
Friday in the week before publication by 10 a.m. Thursday in the week before publication (nation-wide pages)
Friday in the week before publication (Warsaw & local pa ges)
Ale Historia MONDAY
Monday in the week before publication by 10 a.m.
Thursday in the week before publication by 10 a.m. Wednesday in the week before publication by 10 a.m.
Gazeta Komunikaty TUESDAY
Friday in the week before publication
Friday in the week before publication by 10 a.m. Friday in the week before publication
Gazeta Dom
WEDNESDAY
Thursday in the week before publication (nation-wide pages) Monday before publication by 10 a.m.
Friday in the week before publication (Warsaw & local pages)
Thur sday in the week before publication (nation-wide editor ial pages)
Friday in the week before publication (Warsaw & local editorial pages)
Monday before publication (Warsaw & local advertising pages)
Duży Format THURSDAY
Tuesday in the week before publication by 12 a.m.
Monday in the week
before publication by 5 p.m.
Friday in the week before publication
Gazeta Telewizyjna
1 2 working days before publication
7 workin g days before publication
11 working days before publication
MONDAY-SATURDAY
Gazeta Praca
2 working days before publication
(nat ion -wide, Warsaw & local pages)
FRIDAY
Co Jest Grane 24 supplement
or local pages3 (incl. network and
extended coverage offers4)
Friday in the week before publication by 3 p.m. (network pages) Wednesday in the week
before publication by 10 a.m.
Monday before publication (local pages)
Friday in the week before publication by 3 p.m. (network pages)
Monday before publication (local pages)
1 3 working days before publication
(War saw & lo cal pages)
12 working days before publication
(nat ion -wide & Warsaw pages)
FRIDAY
Wysokie Obcasy
SATURDAY
7 workin g days before publication
(nation-wide & War saw pages)
1. For Dimensional Advertisements that are to be placed in Gazeta Wyborcza from page 1 to 15 and on the last page, the order is
also a booking confirmation. Therefore, please ensure that you place your order not only by the deadline specified in Table No.
1 but also not later than 15 working days after the booking date. If we do not receive your order by this date your booking may
be cancelled and offered to another customer.
2. For Dimensional Advertisements prepared by the graphic studio of Agora S.A. the deadline for delivery of materials and
amendments to the Advertisement content is shorter by one working day.
3. Coverage of “Co Jest Grane 24” in the network offer for Voivodeships (Provinces) where "Co Jest Grane 24" is not available in
the whole Province:
PROVINCE
COVERAGE OF GAZETA CO JEST GRANE
POWIATS (DISTRICITS)
kujawsko-pomorskie
Bydgoszcz and Toruń edition
Bydgoszcz, Inowrocław, Mogilno, Żnin, Nakło, Sępólno, Tuchola, Toruń,
Włocławek, Aleksandrów, Radziejów, Lipno, Rypin, Golub-Dobrzyń, Wąbrzeźno,
Grudziądz
pomorskie
Tricity edition
Gdańsk, Gdynia Spot and districts: Gdańsk, Kartuzy, Kościerzyna, Kwidzyń,
Nowy Dwór, Puck, Starogard, Wejherowo, Malbork, Tczew, Sztum
łódzkie
Łódź edition
Łódź and districts: Łódź, Zgierz, Pabianice
lubelskie
Lublin edition
Lublin and districts: Lublin, Puławy, Lubartów, Łęczna, Świdnik
wielkopolskie
Poznań edition
Poznań and districts: Poznań, Gniezno, Grodzisk, Oborniki, Nowy Tomyśl,
Szamotuły, Śrem, Środa Wielkopolska, Września
zachodniopomorskie
Szczecin edition
Szczecin, Świnoujście and districts: Goleniów, Gryfice, Kamień, Police, Stargard
Pyrzyce, Gryfino
4. Editions of “Gazeta Wyborcza”, in which – as part of the extended coverage of “Co Jest Grane 24” offer – advertisements are
published on local pages with the “Co Jest Grane 24” logo: Białystok, Częstochowa, Kielce, Olsztyn, Opole, Płock, Radom,
Rzeszów, Zielona Góra and Gorzów Wielkopolski.
1
GENERAL PRINCIPLES
of placing advertisements in publications of Agora S.A.
Table No. 2
EDITION
DEADLINES FOR PLACING ORDERS, DELIVERY OF CONTENT OF LINEAGE ADVERTISEMENTS
/ AMENDMENTS TO THE ADVERTISEMENT CONTENT AND CANCELLATION OF ORDER
Gazeta
Gazeta
Wyborcza
Praca
Gazeta
Dom
MONDAY-SATURDAY
MONDAY
WENSDAY
Nation-wide pages
The wor king day
before publication by 12 p.m.
Sat urday before publication
on Monday by 6 p.m.
Friday in the week
before publication by 8 p.m.
Monday in the week
before publication by 8 p.m.
Warsaw pages
The wor king day
before publication by 3 p.m.
Sat urday before publication
on Monday by 6 p.m.
Mon day
by 3 p.m.
by 6 p.m.
(only for advertisements ordered through)
the Telephone Customer Service
Saturday in the week before
publication by 5 p.m.
(only for advertisements ordered
at the Advertisement Sales Office)
Saturday in the week before publication
Monday in the week
before publication by 8 p.m.
Białystok pages
The wor king day
before publication by 3 p.m.
Sat urday before publication
on Monday by 1 p.m.
Friday in the week before
publication by 8 p.m.
Monday in the week
before publication by 8 p.m.
Bydgoszcz & Toruń
pages
The wor king day
before publication by 3 p.m.
Sat urday before publication
on Monday by 1 p.m.
Friday in the week before
publication by 8 p.m.
Monday in the week
before publication by 8 p.m
Częstochowa pages
The wor king day
before publication by 3p.m.
Sat urday before publication
on Monday by 2 p.m.
Friday in the week before
publication by 8 p.m.
Monday in the week
before publication by 8 p.m.
Tricity pages
The wor king day
before publication by 4 p.m.
Sat urday before publication
on Monday by 12 p.m.
Friday in the week before
publication by 8 p.m.
Monday in the week
before publication by 8 p.m.
Katowice & Bielsko
-Biała pages
The wor king day
before publication by 3p.m.
Sat urday before publication
on Monday by 1 p.m.
Friday in the week before
publication by 8 p.m.
Monday in the week
before publication by 8 p.m.
Kielce pages
The wor king day
before publication by 3p.m.
Friday in the week before
publication by 8 p.m.
Monday in the week
before publication by 8 p.m
Cracow pages
The wor king day
before publication by 5 p.m.
Sat urday before publication
on Monday
Friday in the week before
publication by 8 p.m.
Monday in the week
before publication by 8 p.m.
2
GENERAL PRINCIPLES
of placing advertisements in publications of Agora S.A.
Table No. 2
DEADLINES FOR PLACING ORDERS, DELIVERY OF CONTENT OF LINEAGE ADVERTISEMENTS
/ AMENDMENTS TO THE ADVERTISEMENT CONTENT AND CANCELLATION OF ORDER
Gazeta
Wyborcza
Gazeta
Praca
Gazeta
Dom
MONDAY-SATURDAY
MONDAY
WEDNESDAY
Lublin pages
The working day
before publication by 3 p.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 8 p.m.
Łódź pages
The working day
before publication by 3 p.m.
Saturday before publication
on Monday by 2 p.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 8 p.m.
Olsztyn pages
The working day
before publication by 3 p.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 8 p.m.
Opole pages
The working day
before publication by 3 p.m.
Saturday before publication
on Monday by 11 a.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 8 p.m.
Płock pages
The working day
before publication by 3 p.m.
Saturday before publication
on Monday by 1 p.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 8 p.m.
Poznań pages
The working day
before publication by 4 p.m.
Saturday before publication
on Monday by 1 p.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 11 p.m.
Radom pages
The working day
before publication by 3 p.m.
Saturday before publication
on Monday by 1 p.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 8 p.m.
Rzeszów pages
The working day
before publication by 3 p.m.
Saturday before publication
on Monday by 1 p.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 8 p.m.
Szczecin pages
The working day
before publication by 5 p.m.
Saturday before publication
on Monday by 1 p.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 8 p.m.
Wrocław pages
The working day
before publication by 5 p.m.
Saturday before publication
on Monday by 1 p.m.
Thur sday before publication
on Friday by 11 a.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 11 p.m.
Zielona Góra & Gorzów Wielkopolski pages
The working day
before publication by 3 p.m.
Friday in the week before publication by 8 p.m. Monday in the week before publication by 8 p.m.
EDITION
A Lineage Advertisement may be ordered through the Publisher’s online customer service not later than 4 hours before the
deadline specified in Table No. 2. It is not possible to amend the content or cancel an advertisement through the online
customer service. If it is necessary to amend the content or cancel an advertisement please contact the telephone customer
service by deadlines specified in Table No. 2.
3
GENERAL PRINCIPLES
of placing advertisements in publications of Agora S.A.
Table No. 3
DEADLINES FOR PLACING ORDERS, DELIVERY OF A CONFIRMED INSERT SPECIFICATION / INSERT AND CANCELLATION OF ORDER
Deadline for placing orders and
delivery of confirmed Insert
specification1
Deadline for delivery of Insert2,
and cancellation of order
Gazeta Telewizyjna FRIDAY Wysokie Obcasy SATURDAY (LOOSE / GLUED-IN / BOUND-IN INSERTS)
14 working days before publication
6 working days before publication
Regular industry and thematic supplements and the main jacket of Gazeta Wyborcza
7 working days before publication
3 working days before publication
Occasional supplements
7 working days before publication
3 working days before publication
Ale Historia (What a History) MONDAY Duży Format (Large Format) THURSDAY (LOOSE/GLUED-IN INSERTS)
7 working days before publication
3 working days before publication
EDITION
1. On the day when you send us the accepted Insert specification at the latest, we must receive at least one copy of the Insert
or its graphic design with detailed specification of its size, weight and volume. If we receive from you the accepted Insert
specification but without at least one copy of the Insert (but only its graphic design and detailed parameters), then the original
of the Insert should be presented to us by you not later than 7 working days before the planned publication date of the Insert
(it applies to all Inserts except for of glued-in inserts, bound-in inserts and samples).
2. If your Insert is glued-in, bound-in, or is a sample to be laminated it is necessary to deliver to us, not later than 6 weeks
before the planned publication date of the Insert, at least 50 units of samples for necessary technical tests. After our
approval of the samples it is necessary for you to provide us with Inserts with the same technical parameters as those that
have successfully passed our tests. In addition, we reserve the right to define additional requirements for certain Inserts with
special properties (e.g. samples of cosmetic products).
3. If your Insert is glued to a Dimensional Advertising you must provide us, not later than 10 working days before the planned
publication date, a model of the Dimensional Advertisement in 1:1 scale with indication of the place where the Insert is to be
glued.
4. For an Insert, a change to the Advertisement content may only consist in delivery of a new Insert by the deadline for delivery of
an Insert specified in the Table above.
4