M80 Ring Road Upgrade
Melbourne, Victoria
Australia
Rok instalacji
2011
klient
Projektowanie
Tulla Sydney Alliance
Douglas Partners
opis
The TECCO slope stabilisation system was selected to stabilise a new cutting, as part of the M80 ring
road upgrade. The cutting, comprising of highly weathered basalt, was 84 degrees and up to 10m in
height. Due to the highly weathered nature of the rock, an erosion control mat was placed underneath
the mesh. Approximately 2500m2 of mesh was fixed to 5m long soil nails on a 2 x 2m, staggered
pattern.
Chroniony Objekt
Systemy
Road
®
TECCO G65/3
Ochrona przeciwerozyjna
GEOBRUGG ULTRACOATING
zabezpieczona powierzchnia
2500 m²
Wysokość skarpy
Nachylenie skarpy
10 m
84 °
środki ochronne
Active slope stabilization
Mata antyerozyjna
Wystawy
Yes
-
®
W razie pytań prosimy o kontakt ze specjalistą Geobrugga.
Eberhard Gröner
Project Manager North-West Germany, Regional Manager UK
Phone +41 71 466 81 57
Mobile +41 79 421 17 01
[email protected]
Geobrugg AG
Aachstrasse 11 | 8590 Romanshorn | Szwajcaria
[email protected] | www.geobrugg.com
Ein Unternehmen der Gruppe BRUGG | ISO 9001 zertifiziert
Stabilizacja skarp | M80 Ring Road Upgrade, AU
2/2