Investment Location (City, Region) Company Type/Size

Transkrypt

Investment Location (City, Region) Company Type/Size
Investment
Location (City, Region)
Company
Elektrownia
Północ
Sp.z.o.o.
Status of
investment
(stage in the
investment
process)
Rajkowy near Pelplin,
Elektrownia Północ sp.
Tczewskie, Pomorskie
z.o.o. part of Kulczyk
Voivodship
Investments Group
Commenced investment process;
Type/Size (number of
units and capacity of
each unit)
Coal/ 2000 MW
EIA report available since April 2010;
Currently local spatial development plan from parts of the geodesic land of
Subkowy and Wilka Słońca related to the passing of the pipeline and water
extraction site and waste disposal for the planed coal power plant in Rajkowy in
Pelplin community in the process.
Decision on environmental conditions for construction of a 2000 MW power
plant ‘Północ’ in Rajkowy dated 8 September 2010
Elektrownia Północ Sp. Z.o.o. included in the ‘Change of the Environmental
Protection Programme for the City and Municipality of Pelplin for years
2008-2010, with extension for 2012-2015, regarding construction of a power
plant ‘Północ’ and ‘Change of the Waste Management Programme for the
City and Municipality of Pelplin for years 2008-2010, with extension for 20122015, regarding construction of a power plant ‘Północ’;
The start up of the new power plant ‘Północ’ in Pelplin planned for 2016/2017;
Local
authorities
engaged in
the
proceedings
Regional Directorate for Environmental Protection (RDOS) in Gdańsk:
ul.Chmielna 54/57, 80 - 748 Gdańsk
(0048) 58 68 36 800
[email protected] , http://www.gdansk.rdos.gov.pl
Municipality of Pelplin:
Plac Grunwaldzki 4, 83-130 Pelplin
(00 48) 58 536 - 12 – 61
[email protected] , www.pelplin.pl
County office in Tczew:
ul. Piaskowa 2, 83-110 Tczew
(0048) 58 7734 800
[email protected] , www.powiat.tczew.pl
Summary
Decision on environmental conditions for construction of a 2000 MW power
of consents plant ‘Północ’ in Rajkowy dated 8 September 2010 (case sign: RDOŚ-22and permits WOO.6670/27/10/AT/KSZ) issued to Elektrownia Północ Sp.z.o.o. by the
held
Regional Directorate for Environmental Protection in Gdańsk;
Summary
of consents
and permits
applied for
(pending)
Financing
Construction permit for power plant's infrastructure (will be obtained by June
2011 according to the investor's website: http://elektrowniapolnoc.pl/o-elektrownipolnoc/nasza-elektrownia/harmonogram-prac/) and integrated permit pending.
New EIA has to be prepared along with the building permit application.
Decision on connection to national electric grid pending as of (31.01.2011) by
PSE in 2011.
According to the information provided by PAP (Polish Press Agency) on the 16th
of September 2010 Board Member of Elektrownia Północ Ltd -Karol Pawlak –
stated that conversations on investment financing are held with both the EIB and
EBRD ( 2010-09-16, PAP). Investment costs are estimated to be between 12 and
15 mld zł (3.1 and 3.86 bln euros). No easily accesible data on investment
financial structure (as of 17.01.2011). As of 18.01.2011 EBRD – claims that
there are no formal talks on financing running between the EBRD and the
investor. In Feb 2011 EIB admitted that is has been approached by Kulczyk
Investement's representatives.
Additional
Investment in close proximity to Nature 2000 site in the Vistula Valley.
information Enlisted as National Energetic System power plant in government documents
(12.2010) (strategic importance).
Additional information in:
http://wyborcza.biz/biznes/1,100969,8386084,Pomorskie__W_gminie_Pelplin_powstanie_elektrow
nia.html
http://www.pelplin.pl/?a=1&id=4911
Interested parties
Rajkowy Major (Sołtys) - Janem Krajnik
Pelplin Major - Andrzej Stanuch
Subkowy (nearby village) major (wójt) - Mirosław Murzydło
Tczewski powiat Head (starosta) - Witoldowi Sosnowskiemu
A member of the regional parliament (radny Sejmiku Wojewódzkiego) - Patryk Demski
(potencjalny sojusznik)- potenital ally.
Gniewa Major (burmistrz) - Bogdan Badziong
Monument conservation authorithy head in Pomerania region (Wojewódzki konserwator zabytków)
- Marian Kwapiński- potenial ally (potencjalny sojusznik)
The vice-president of Pomerania planists in a department of regional development and planning in
marszalkowski council authority (Zastępca szefa wojewódzkich planistów, z marszałkowskiego
departamentu rozwoju regionalnego i przestrzennego) - Feliks Pankau
Head of the Pomerania Voivodship regional authorities - (Marszałek wojewodztwa pomorskiego) Mieczysław Struk
Director of Elektrowni Północ Ltd. - Karol Pawlak
Board Member of Elektrownia Północ Ltd - Jacek Strzelecki
Północ Power Plant Chief Designer - inż. Jacek Witkowski.
Pracownia Ochrony Środowiska (Environmental Protection Lab) Director - inż. Wojciech Orzeszek
(from Energoprojekt Warszawa- the power plant's designer).
RDOŚ w Gdańsku (Regional Directorate of Environmental Protection in Gdansk) - Hanna
Dzikowska, Grażyna Link.
A journalist from the local newspaper (writing about local opposition to the power plant's
construction cases)- Przemysław Zieliński.
Kulczyk Holding spokesperson - Marta Wysocka.
Opposition:
a) Grzegorz Wasielewski <[email protected]> (były radny gminy Gniew, gdzie wczesniej miala
powstac elektrownia Vattenfalla, który się wycofal pod koniec ubieglego roku). Zbiera inforamacje
o lokalnych rolnikach przeciwnych budowie rurociagu przez ich pola oraz zapisy rozmow między
RDOSiem w Gdansku, a Vattenfallem (RDOS był podobne sceptycznie nastawiony do w miare
podobnego pod wzgledem srodowiskowym projektu)
b) Rodzina Brzozowskich mieszkała w domu that o 100 metrów od planowanej elektrowni. Do
12.2010 starali się powstrzymac proces uzyskania dezycji srodowiskowej i odwolali się od niej, ale
wycofali się ze sprawy pod koniec grudnia 2010. Brak dalszych informacji i nie udało mi się
skontaktować z rodziną.
Potential allies:
a) Stowarzyszenie Dorzecza Dolnej Wisły "WISŁA" O/Tczew (Assosiation of Lower Vistula River
basin in Tczew)
b) Towarzystwo Miłośników Ziemi Tczewskiej (Assosiation of Tczew Region Fans).
c) Koło Pszczelarskie w Pelplinie.
In April 2010 the project of Elektrownia Polnoc has been sent to the Ministry of Economy and was
listed as one of the priority projects in gaining free alocations of CO2 production.